Standard Cited: 19100269 L01 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1452177.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,374.00
Current Penalty: $4,424.40
Issuance Date: 03/16/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/07/2020
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 04/02/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/02/2020 | $4,424.40 | 04/07/2020 | Serious | |
| Penalty | Z: Issued | 03/16/2020 | $7,374.00 | 04/07/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.269(l)(1)(iii): Electric lines and equipment were not considered and treated as energized before they had been deenergized in accordance with paragraph (d) or (m) of this section. (a) Pole with Tag 336-04-34 -On or about December 17, 2019 the employer did not ensure employees followed the procedure to deenergize the lines, exposing employees to electrical shocks.