Violation Detail
Standard Cited: 19260251 E08 III Rigging equipment for material handling.
Inspection Nr: 1427270.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,446.00
Current Penalty: $0.00
Issuance Date: 02/10/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/26/2020
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 02/26/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/26/2020 | $0.00 | 02/26/2020 | Serious | |
| Penalty | Z: Issued | 02/10/2020 | $9,446.00 | 02/26/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.251(e)(8)(iii): Synthetic web slings were not immedialtely removed from service when any of the following conditions were present: snags, punctures, tears or cuts. Employees moving a heat exchanger used synthetic slings that had visible damage and were not immediately removed from service were exposed to struck by hazards.
Translate