Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1410324.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,419.00
Current Penalty: $10,419.00
Issuance Date: 12/18/2019
Nr Instances: 3
Nr Exposed: 2
Abatement Date: 01/15/2020
Gravity: 5
Report ID: 0317300
Contest Date: 01/06/2020
Final Order: 03/19/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 03/19/2020 | $10,419.00 | 01/15/2020 | Serious | |
| Penalty | C: Contested | 01/07/2020 | $10,419.00 | 01/15/2020 | Serious | |
| Penalty | Z: Issued | 12/18/2019 | $10,419.00 | 01/15/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a) 29005 John J. Williams Highway, Millsboro, Delaware, Roof - On or about June 20th 2019, where employees were engaged in servicing and maintenance of the EF-7 Exhaust Fans for the Condensation Control System, the employer failed to ensure that the energy control procedure clearly and specifically outlined specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy as required in paragraph (B) of this section. b) 29005 John J. Williams Highway, Millsboro, Delaware, Roof - On or about June 20th 2019, where employees were engaged in servicing and maintenance of the EF-7 Exhaust Fans for the Condensation Control System, the employer failed to ensure that the energy control procedure clearly and specifically outlined the steps for placement, removal and transfer of lockout devices or tagout devices and the responsibility for them as required in paragraph (C) of this section. c) 29005 John J. Williams Highway, Millsboro, Delaware, Roof - On or about June 20th 2019, where employees were engaged in servicing and maintenance of the EF-7 Exhaust Fans for the Condensation Control System, the employer failed to ensure that the energy control procedure clearly and specifically outlined the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control as required in paragraph (D) of this section.