Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1409768.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,246.00
Current Penalty: $3,623.00
Issuance Date: 08/29/2019
Nr Instances: 3
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 09/24/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/24/2019 | $3,623.00 | Serious | ||
| Penalty | Z: Issued | 08/29/2019 | $7,246.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On, or about, June 17, 2019, the following mechanical power presses were not locked out when tool punches/inserts were changed. The stations were not protected by safeguarding such as a light curtain, when employees accessed the tooling: A. Press 50, Bliss partial revolution press, station accessed through hinged plexiglass door at back of press. B. Press 332, a V&O partial revolution press, station accessed through the side of the guard. C. Press 334, a Walsh partial revolution press, station accessed through the side of the guard.