Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1214706.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/25/2017
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 09/21/2017
Gravity: 5
Report ID: 0316300
Contest Date:
Final Order: 09/20/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 08/25/2017 | $0.00 | 09/21/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a) Flatwoods Job Corps, 2803 Dungannon Rd, Coeburn, VA 24230: On March 6, 2017, and times prior thereto, the employer did not guard the unused portion of the Jet horizontal band saw blade to the left of the position blade guide, exposing employees and contracted instructors to amputation hazards. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Translate