Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1122200.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/27/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/23/2016
Gravity: 10
Report ID: 0418800
Contest Date:
Final Order: 06/08/2016
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 04/27/2016 | $0.00 | 05/23/2016 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: On or about February 2, 2016, at the above addressed jobsite, employees were exposed to an electrocution hazard while installing a new A/C unit system while working near energized electrical conductors.