Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1642024.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,688.00
Current Penalty: $3,281.60
Issuance Date: 04/14/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/01/2023
Gravity: 10
Report ID: 0626600
Contest Date:
Final Order: 06/01/2023
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/01/2023 | $3,281.60 | 06/01/2023 | Serious | |
| Penalty | Z: Issued | 04/14/2023 | $4,688.00 | 06/01/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.850(a): The employer did not have written evidence of the engineering survey that had been performed prior to the start of demolition operations. On or about January 5, 2023, the employer did not have written documentation of the engineering survey prior to the start of demolition activities by employees.