Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1615750.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,938.00
Current Penalty: $10,938.00
Issuance Date: 02/01/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/28/2023
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 03/01/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 02/01/2023 | $10,938.00 | 02/28/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) At the cooling department, the wiring of an Environmental Chamber was not de-energized when employees performed troubleshooting, exposing the employees to electrical hazards.