Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1576885.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $10,360.00
Current Penalty: $6,216.00
Issuance Date: 07/26/2022
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 08/01/2022
Gravity: 5
Report ID: 0213100
Contest Date:
Final Order: 08/22/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/22/2022 | $6,216.00 | 08/01/2022 | Other | |
| Penalty | Z: Issued | 07/26/2022 | $10,360.00 | 08/01/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) G1 Saturator Section (G1 Line - Paper Machine) - On or prior to February 8, 2022, the employer did not conduct a periodic inspection of the energy control procedure for the G1 Wire Changes - Saturator.