Violation Detail
Standard Cited: 19100269 D06 VII Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1488577.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,494.00
Current Penalty: $13,494.00
Issuance Date: 12/15/2020
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 10/21/2021
Gravity: 10
Report ID: 0626600
Contest Date: 01/11/2021
Final Order: 06/10/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/10/2021 | $13,494.00 | 10/21/2021 | Other | |
| Penalty | C: Contested | 01/11/2021 | $13,494.00 | 01/05/2021 | Serious | |
| Penalty | Z: Issued | 12/15/2020 | $13,494.00 | 01/05/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(d)(6)(vii): Before starting work on machines or equipment that had been locked out or tagged out, the authorized employee did not verify that isolation and deenergizing of the machine or equipment had been accomplished. On or about August 17, 2020, near the back yard easement of private residential homes located in Kingwood, TX, employees were exposed to electrical hazards when working on or near an energized 19.9 kilovolt power line, without verifying that it was de-energized.