Violation Detail
Standard Cited: 19260859 G Mechanical demolition.
Inspection Nr: 1453613.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,398.00
Current Penalty: $3,800.00
Issuance Date: 01/29/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 02/21/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/21/2020 | $3,800.00 | Serious | ||
| Penalty | Z: Issued | 01/29/2020 | $5,398.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.859(g): During demolition, continuing inspections by a competent person were not made as the work progressed to detect hazards resulting from weakened or deteriorated floors, or walls, or loosened material. Employees were also permitted to work where such hazards existed without being corrected by shoring, bracing, or other effective means: On or about December 27, 2019, employees were performing demolition of interior walls with a Wacker Neuson excavator and the ceiling collapsed and the competent person did not detect and correct hazards by shoring, bracing, or other effective means.