Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1387232.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $13,260.00
Current Penalty: $7,956.00
Issuance Date: 06/06/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 07/01/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/01/2019 | $7,956.00 | Serious | ||
| Penalty | Z: Issued | 06/06/2019 | $13,260.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): (a) For the employees operating the rotary draw tube bending machine on or about March 20, 2019 and times prior thereto, the employer did not provide guarding to prevent operators from having their hands in the point of operation when the machine is operating.
Translate