Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 1347267.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,805.00
Current Penalty: $8,964.00
Issuance Date: 10/26/2018
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 11/23/2018
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 11/27/2018
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/27/2018 | $8,964.00 | 11/23/2018 | Serious | |
| Penalty | Z: Issued | 10/26/2018 | $12,805.00 | 11/23/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.219(c)(2)(i): All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting: (a) PROCESSING ROOM - Employees climbed under the Twisty Pretzel Machine to remove pretzel dough that had built up and the employee(s) were exposed to a rotating drive shaft, on or about September 4, 2018. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate