Violation Detail
Standard Cited: 19100147 C07 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1339262.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $8,315.00
Current Penalty: $0.00
Issuance Date: 11/19/2018
Nr Instances: 1
Nr Exposed: 18
Abatement Date: 04/17/2019
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 12/12/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/12/2018 | $0.00 | 04/17/2019 | Serious | |
| Penalty | Z: Issued | 11/19/2018 | $8,315.00 | 04/17/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees: a. On or about August 16, 2018, the employer did not ensure employees were adequately trained in the purpose and function of the energy control program. Employees were required to perform activities such as thread head changes on the M-37 Thread roller, and are exposed to crushing and amputation hazards from potential movement of the thread head in that the equipment was not properly deenergized.
Translate