Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1275944.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $12,675.00
Current Penalty: $12,675.00
Issuance Date: 12/22/2017
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/10/2019
Gravity:
Report ID: 0626600
Contest Date: 01/25/2018
Final Order: 03/06/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/06/2019 | $12,675.00 | 09/10/2019 | Other | |
| Penalty | C: Contested | 01/29/2018 | $12,675.00 | 01/19/2018 | Serious | |
| Penalty | Z: Issued | 12/22/2017 | $12,675.00 | 01/19/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii): The procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance, including but not limited to subparagraphs (A) through (D): On or about November 7, 2017, at the roll former line #5, the energy control procedure did not include specific procedural steps for the shutting down, isolating, blocking and securing of the roll form line, and did not include the use of a die block, exposing employees to being struck-by the die during unjamming at the TOG-LOC station.