Violation Detail
Standard Cited: 19100146 D02 Permit-required confined spaces
Inspection Nr: 1259741.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $12,934.00
Current Penalty: $25,868.00
Issuance Date: 02/27/2018
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 10
Report ID: 0317500
Contest Date: 03/20/2018
Final Order: 09/13/2019
Related Event Code (REC): A
Emphasis:
Substance: 1480
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 09/13/2019 | $25,868.00 | Serious | ||
| Penalty | C: Contested | 04/20/2018 | $12,934.00 | Serious | ||
| Penalty | Z: Issued | 02/27/2018 | $12,934.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.146(d)(2): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not identify and evaluate the hazards of permit spaces before employees entered: a) In the North Division Vault of the North LDS Pond, on or about August 29, 2017 - The employer failed to identify and evaluate hazards of the vault before employees began to open the 24-inch LDS pipe line which introduced a water engulfment hazard, hydrogen sulfide atmospheric hazard, and hazards associated with oxygen fuel gas torch use into the space.
Translate