| # | Letters of Interpretation |
|---|---|
| 1 | - 1926.757(b)(3) - Permissibility of the welding of joists over 40-feet in length, while the hoisting line is kept in place, instead of field bolting. |
| 2 | - 1926.757(b)(3) - Field bolting and welding requirements for steel joist assembly |